Business Continuity Plan Template for Small Businesses (UK)

A business continuity plan sets out how your business keeps its most important work going when something stops it: a fire, a flood, a cyber attack, a failed supplier or a key person off sick. This free template, in Excel and Word, sizes the plan for a small business: an impact analysis that works out your recovery targets, the dependencies that could sink you, a contact tree, a one-page first-hour card and a testing schedule, with a UK firm’s plan worked through in full.

Free, UK English, no sign-up. Blank tabs to fill in, live formulas, and the Harbour Lane IT example on matching tabs.

Key takeaways

  • Plan for the loss, not the cause. Fire, flood and ransomware all come down to losing people, a place, IT and data, or a supplier.
  • Score each activity’s damage over time. The point it becomes unacceptable is the MTPD; your recovery target (RTO) must sit inside it.
  • Your backup interval is your worst-case data loss (RPO). A restore you have never timed is a hope, not a recovery time.
  • The most valuable line in most small-business plans is a single point of failure: one person, one login, one internet line.
  • You can write a working plan in an afternoon. Proving it works takes the next 90 days: one restore test, one contact-tree check, one tabletop exercise.

What is a business continuity plan?

A business continuity plan (BCP) is a short document that answers, in advance, the questions you will not have time to think about on the day: what has to keep going, how quickly, with what, who decides and who needs to be told. It is written for the people who will use it under pressure, which for a small business usually means the owner, a deputy and two or three team leads.

It sits between two other documents. An incident response plan deals with the next hour of a specific event, such as containing a cyber attack. An IT disaster recovery plan is the technical runbook for restoring systems and data. The continuity plan is the business layer over both: it decides that the service desk must be answering calls within two hours, and leaves IT to work out how. Keep that split and the plan stays short.

It is also not a risk register. A risk register asks how likely each threat is and how to make it less likely. A continuity plan assumes something has already happened and asks how to keep trading. The two work together: the continuity plan’s single points of failure belong on the risk register as risks to reduce.

If you have searched for a template, you will have met a lot of council PDFs. That is no accident: the Civil Contingencies Act 2004 requires councils in England, Scotland and Wales to give businesses advice on keeping going in an emergency. Their templates are sound but generic, written for every kind of business at once. This one is written for a firm of five to fifty people that runs on laptops, cloud software and a handful of suppliers.

The five questions a small-business plan must answer

Every section of the template answers one of five questions, in order, because each answer feeds the next. You cannot write a sensible workaround until you know what the activity depends on, and you cannot know what to protect first until you know how long each activity can stop.

#Question and what you writeWhere in the workbook
1How long can each activity stop?
The impact clock: score the damage at five points in time, find the point the damage becomes unacceptable, and set a recovery target inside it.
BIA tab
2What does it depend on?
People, place, IT and data, suppliers. Anything with no deputy or alternative is a single point of failure.
Dependencies tab
3What will we do instead?
A workaround for each critical activity that works without the thing you have lost, written before you need it.
Plan tab
4Who decides, and who is told?
Who can invoke the plan, the triggers, the contact tree and the first-hour card.
Contacts and First hour tabs
5How do we know it works?
A restore you have timed, a contact tree you have rung, a tabletop you have run. Dates, not intentions.
Recovery and Testing tabs

The organising idea is to plan for the loss, not the cause. There are dozens of things that could go wrong and only four kinds of thing you can lose: people, a place, IT and data, or a supplier. A burst pipe, a power cut and a landlord’s dispute all mean “we cannot use the office”, and they share a workaround. A plan with a chapter per disaster grows long and still misses the one that happens; a plan built on the four losses stays short and covers events nobody listed.

The minimum viable plan: one afternoon, four hours

If you have nothing today, block out an afternoon with whoever knows the business best and work through these four steps with the workbook open. At the end you will have a plan people can follow, which is more than many small firms ever write.

WhenStepDo thisYou end with
Hour 1The clockList the 5 to 8 activities that bring in money or keep a promise. Score each at 4 hours, 1 day, 3 days, 1 week and 2 weeks.MTPD and a recovery target for each (the workbook works them out)
Hour 2The chainFor the activities with the shortest clocks, write down what each needs: people, place, IT and data, suppliers.Your single points of failure, flagged
Hour 3The workarounds and the treeOne or two sentences per critical activity on what you will do instead. Build the contact tree. Collect suppliers' emergency numbers.A plan people can follow
Hour 4The card and the dateAgree who can invoke and when. Print the first-hour card and put copies where you can reach them without the office. Book the first test.A one-page card and a test in the diary

What an afternoon does not give you. Honest recovery times. In the first hour you will write targets, not facts: until you have restored a mailbox and watched the clock, you do not know whether “back within a day” is true. You also will not have your suppliers’ answers on how they would restore your data. Put three dates in the diary before you finish: a contact-tree check next week, a restore test within a month and a tabletop exercise within 90 days. That is when the plan stops being a document and becomes something you have proved.

Business impact analysis template: how long can each activity stop?

A business impact analysis (BIA) scores the damage each activity’s loss would do at set points in time, so you know which to recover first and how quickly. It is the part of the plan that everything else depends on, and the part most templates leave as an empty table with “RTO” at the top.

Start with the mechanism, because it explains the method. Damage from a stoppage does not grow smoothly; it grows in steps, because a business is a set of promises with deadlines attached. An urgent-ticket response time is a promise measured in hours. A payroll date is a promise to staff measured in days. A client’s patience is a promise measured in weeks. For each activity, the damage jumps as each promise is broken. Somewhere along that staircase is a step the business cannot accept: lost clients, a legal breach, harm to people, damage it might not recover from. That step is the maximum tolerable period of disruption (MTPD).

The recovery time objective (RTO) is the target for having the activity back, and it must sit inside the MTPD with room to spare. The room matters because two things take time that people forget to count: noticing and deciding to invoke the plan, and the recovery itself. A target equal to the MTPD means you are relying on a perfect day.

RPO looks back, RTO and MTPD look forwardOne incident, three numbersearlierlaterLast good copyyour newest backupIncidentthe activity stopsBack runningwithin the RTOPoint of no returnthe MTPDRPO: work you redoRTO: time to recovermargin
RPO looks back from the incident to your last good copy; RTO and MTPD look forward. The gap between RTO and MTPD is the margin you need for deciding and recovering.

How to score it

For each activity, ask: if this stopped now, what is the worst thing that would have happened by each point in time? Score it 0 to 4. Score the worst consequence of any kind, whether money, clients, legal exposure or harm to people, rather than adding them up; one severe consequence is severe.

ScoreLabelMeans
0NoneNobody outside the team would notice.
1MinorInternal inconvenience; catch-up work, no client impact.
2NoticeableClients notice; complaints, small costs, work piling up.
3SeriousContract or service-level breaches, real money lost, clients threatening to leave.
4SevereClients lost, a legal or regulatory breach, harm to people, or damage the business may not recover from.

The workbook reads across each row, finds the first point that scores 4 and reports it as the MTPD. It then suggests an RTO one step earlier, checks the RTO you actually set is below the MTPD, marks anything that turns severe within a week as critical, and ranks the activities into a recovery order. An activity that is already severe at four hours gets a different message: it needs a workaround that is set up before anything goes wrong, because no recovery will be fast enough.

RPO: the number that is really about your backups

The recovery point objective (RPO) belongs to data rather than activities. It is how much recent work you could lose and redo. If your backup runs at 10pm and ransomware locks your files at 4pm the next day, the newest clean copy is 18 hours old, and those 18 hours of invoices, emails and changes are gone. So the backup interval is your worst-case loss, and the rule is simple: copy the data at least as often as its RPO.

Dependencies and single points of failure

For each critical activity, write down what it needs under four headings: people, place, IT and data, suppliers. Then, against each, name a deputy or an alternative. Wherever that box stays empty, you have found a single point of failure.

In small firms the most dangerous ones are usually people, and they hide inside job titles. One person runs payroll. One engineer holds the admin login to the system the whole service runs on. One person knows where the domain name is registered. Nobody plans for them because nobody thinks of a colleague as infrastructure. One IT practitioner’s account of a colleague’s sudden absence is typical: backups nobody else could see, security alerts nobody else was reading, and access rebuilt one system at a time.

Three fixes cover most of them. Make sure at least two people, one of them outside IT, can reach every admin account, through a company password manager rather than a notebook. Have someone other than the person who set up the backups run a restore. And have each deputy actually do the job once, with the regular person watching, before the day they have to.

Place and suppliers come next. Can the work happen anywhere with an internet connection, or only in the office? Is there one internet line? For each supplier the business cannot work without, record the emergency number, the account or contract reference, and what you would do if it stopped. Our contract database template holds the contract details if you need somewhere to keep them.

Workarounds: what you will do instead

A workaround is the way an activity keeps going without the thing you have lost, and it is only real if it is set up before you need it. “Divert the phones to mobiles” is a workaround if the divert is configured and someone knows the code. It is a wish if the divert has to be arranged with the phone supplier on the morning of the outage.

Write each one so that someone who has never done it could follow it: who starts it, what they need, where that is kept. Keep them modest. Most small-business workarounds are dull and cheap: work from home on company laptops, take orders on a shared spreadsheet, pay staff last month’s amount as an advance if payroll software is down in pay week, raise urgent invoices by hand. Then test the ones that matter most with a drill, because the first run of a workaround always turns up something, such as a laptop without the right software or a phone without the divert code.

IT recovery inside a business continuity plan

The continuity plan records, for each system and set of data, what must be running again and how soon: the RPO, the RTO, how often it is copied and when a restore was last timed. The step-by-step restore instructions belong in a separate IT disaster recovery plan that the continuity plan points to. That keeps this document readable by the people running the business, not only the people running the servers.

Four things are worth getting right at this level.

  • Know what you hold and where. You cannot set an RPO for data you have not listed. A clear company shared drive folder structure makes this much easier: when the drive is organised by department and owner, you can see what must come back first, and restore one folder rather than everything.
  • Keep a copy that an attack cannot reach. The National Cyber Security Centre’s small organisations guide advises backing up everything the business needs to operate, considering two backups (one online and one on a storage device), not leaving a backup device connected when it is not in use, and protecting online backups with two-step verification.
  • Time a restore. The same guidance tells you to check that you know how to restore and that the backup contains your important data. Go one step further for the plan: time it. A measured restore time is the only honest way to fill in “can we meet the RTO?”. The workbook marks any recovery never tested, or not tested for a year, in red.
  • Read your cloud contracts. A software-as-a-service supplier keeping its service running is not the same as it being able to give you back last Tuesday’s data. Ask each critical supplier, in writing, how far back it can restore your data and how long that takes, and write the answers in the plan.

Loss of IT can also be a data protection event. The Information Commissioner’s Office (ICO) treats losing access to personal data as a personal data breach when it has a significant effect on people, and a breach that must be reported has to be reported within 72 hours of your becoming aware of it. Our IT incident report template walks through that decision.

Who decides, and who is told

Name one person who can invoke the plan, a deputy for when they cannot be reached, and the triggers that should make them do it. Without triggers, plans are invoked late: everyone waits for someone else to call it. Harbour Lane’s are typical:

  • Any critical activity is likely to stay down longer than its recovery time objective (RTO).
  • We cannot use the office, or cannot reach it, for the rest of the working day.
  • A P1 incident (on our incident report template's priority matrix) has lasted an hour with no fix in sight.
  • A cyber attack is suspected: files locked, accounts taken over, a ransom demand.
  • A key person or supplier is suddenly unavailable and a critical activity depends on them.

The contact tree

A contact tree spreads the calling so that nobody spends the first hour on the phone. Our rule of thumb: nobody makes more than five calls, and the last person on each branch rings their caller back, so a missing reply shows up at once rather than at lunchtime. Twenty-two people can be reached in two rounds.

A contact tree: 22 people, two rounds, nobody makes more than five callsManaging directorOps leadround 2: person 1round 2: person 2round 2: person 3round 2: person 4rings back: person 5Service desk leadround 2: person 1round 2: person 2round 2: person 3round 2: person 4rings back: person 5Office managerround 2: person 1round 2: person 2round 2: person 3rings back: person 4Sales managerround 2: person 1round 2: person 2rings back: person 3Dashed line: the last person on each branch rings back, so the caller knows the branch is complete.
Harbour Lane’s tree: the workbook counts each caller’s calls, flags anyone making more than five, and works out each person’s round and how many rounds it takes to reach everyone.

Clients need a message too, and it is far easier to write calmly in advance. The template includes a fill-in-the-blanks version: what has happened, what is affected and what is not, what to do instead, and when the next update will come.

The first-hour card

The whole plan will not be read in the first hour, so put the first hour on one page and keep copies away from the office, at the plan owner’s and deputy’s homes and as a photo on their phones. Ours has eight steps:

  1. Make people safe. If anyone is at risk, ring 999 first. Account for everyone before anything else.
  2. Decide whether to invoke. The plan owner checks the triggers. If the owner has not answered within 15 minutes, the deputy makes the call.
  3. Name what has stopped. Which activities on the BIA list are affected, and what is the first RTO that will run out?
  4. Start the contact tree. Send the agreed message. Each caller rings their list; whoever is last on a branch rings the caller back.
  5. Start the workarounds. For each affected activity, the named person starts the workaround on the Plan tab.
  6. Tell clients and suppliers. Use the prepared message. Say what is affected, what to do instead, and when the next update is.
  7. Start a log. Time, decision, who decided, what it cost. It runs the recovery and supports any insurance claim.
  8. Check the legal duties. If personal data is unavailable, lost or exposed, run the breach decision on the incident report page now: the ICO's 72-hour clock starts when you become aware.

Emergency numbers worth printing on it: 105 for power cuts (free in England, Scotland and Wales; in Northern Ireland, NIE Networks on 03457 643 643), Floodline on 0345 988 1188 (in England you can also register the office for flood warnings online; Scotland and Wales run their own services), and Report Fraud on 0300 123 2040 for a cyber attack (in Scotland, Police Scotland on 101).

Testing: how you know it works

Test small and often rather than big and rarely. A quarterly contact-tree check takes 15 minutes and finds the numbers that have changed. A quarterly restore test finds the backup that has been quietly failing. A tabletop exercise, in which the people named in the plan talk through a scenario round a table, finds the assumptions nobody had noticed they were making. The NCSC’s Exercise in a Box provides ready-made cyber attack scenarios free of charge.

TestHowHow oftenTime
Contact tree checkSend the test message; time how long until the last person replies. Fix any number that fails.every 3 months15 min
Restore testRestore one system or folder from backup, in rotation. Time it and write the time on the Recovery tab.every 3 months60 min
Work-elsewhere drillRun one critical activity from home or a second site for a morning, using only the plan.every 6 months240 min
Tabletop exerciseTalk a scenario through with the people named in the plan; for a cyber attack, use the NCSC's free Exercise in a Box.every 12 months90 min
Supplier checkAsk each critical supplier how they would keep your service going, and how quickly they restore your data.every 12 months60 min
Plan reviewRead the whole plan with the owner; update names, numbers, RTOs; sign it off. Also after any big change.every 12 months60 min

The workbook’s Testing tab works out when each test is next due and shows anything overdue in red. Record what each test found, and carry the fixes into an action list. After a real incident, add a review: what the plan got right, what was missing, and which numbers turned out to be wrong.

Worked example: Harbour Lane IT’s continuity plan

Harbour Lane IT Ltd is a 22-person managed IT services firm supporting about 140 small-business clients from one office (fictional). It is the firm whose client portal went down for 3 hours 40 minutes on the morning described in our incident report template, and whose gap analysis found that restores were “tested when someone remembers” and that the security incident steps lived in two people’s heads. Its managing director wrote the plan below in one afternoon, using the workbook.

The impact analysis

Eight activities, each scored at the five points in time. The colours are the workbook’s.

Activity4 h1 day3 days1 week2 weeksMTPDOur RTO
A1 Service desk: answering client calls and tickets344441 day2 hours
A2 Remote monitoring and security alerts for clients234443 days8 hours
A3 Checking client backups and running restores123441 week1 day
A4 Client support portal123441 week1 day
A5 Payroll for our 22 staff (monthly)001342 weeks3 days
A6 Invoicing and credit control01123Over 2 weeks1 week
A7 Project installs and upgrades01233Over 2 weeks1 week
A8 Sales and quotes00112Over 2 weeks2 weeks

Four activities turn severe within a week, so they are critical: the service desk, client monitoring and security alerts, client backups, and the portal. Payroll is not critical in most weeks, but its clock shortens to three days in pay week, which the plan notes. The service desk cannot wait even a day, and its two-hour target is only realistic because the phone divert and the shared spreadsheet are set up in advance.

The plan’s most useful output was not a recovery target but three names with no deputy beside them.

Single points of failure

The Dependencies tab flagged three rows with nothing in the deputy column.

ActivityWhat it needsNamed person or supplier
A1Office internet line (single fibre)Internet provider
A2Engineers with admin rights to the monitoring platformLead engineer
A5Payroll run and approvalOffice manager

One fibre line carries the whole office. One engineer holds the admin rights to the monitoring platform. One person runs payroll: the office manager, who on the morning of the portal outage was also the person who recovered access to the certificate authority account. None of the three had appeared on the firm’s risk register.

Data and recovery

Six systems and sets of data, checked against how often they are copied and when a restore was last timed.

System or dataRPO neededCopied everyRPO checkLast restore testRTO check
Ticketing system data4 h24 hGapneverUNTESTED
Shared drive (company files)24 h24 hMet5 months agoProven
Microsoft 365 mailboxes24 h24 hMetneverUNTESTED
Monitoring platform settings24 h24 hMet14 months agoTest out of date
Payroll records168 h24 hMet2 months agoProven
Accounts and invoices24 h24 hMet8 months agoProven

The ticketing system is the one that matters most and the one the firm knew least about: tickets need an RPO of four hours, the supplier’s contract mentions daily copies, and nobody had ever asked it for a restore. The monitoring settings were restored once, 14 months ago, so that test no longer counts.

What the afternoon produced

Six actions, each with an owner and a date.

ActionOwnerDue
Add a 4G/5G backup router so the office keeps internet if the fibre line failsOps lead1 month
Give a second engineer admin rights to the monitoring platform; put the emergency admin login in the company password managerOps lead2 weeks
Write a payroll checklist and have the managing director run one month's payroll with the office managerOffice managerNext pay run
Export open tickets to the shared drive every morning, until the ticketing supplier confirms how far back it can restoreService desk leadThis week
Restore a test mailbox and the ticketing data, and time bothLead engineer1 month
Pre-set the phone divert to analysts' mobiles and test it on a Friday afternoonService desk lead2 weeks

Every action closes a single point of failure, a data gap or an untested recovery, and most cost little more than an afternoon of someone’s time. The single point of failure actions go on the risk register; the action list itself can live in a RAID log (risks, actions, issues and decisions) alongside the firm’s other improvement work.

The backup router, for the first action. The simplest fix for a single fibre line is a router that holds a second connection over the mobile network and switches to it on its own. This is one example of the type. The link goes to Amazon UK and is an affiliate link: as an Amazon Associate, IT Management 101 earns from qualifying purchases, at no extra cost to you.

DrayTek Vigor 2927Lax-5G dual-WAN router with built-in 5G/4G modem by DrayTek, product photo

DrayTek Vigor 2927Lax-5G dual-WAN router with built-in 5G/4G modem

DrayTek

Two Ethernet WAN ports and a 5G/4G modem with a SIM slot. The fibre plugs into one port; if it drops, the router moves the office onto the mobile connection without anyone touching it. It replaces the office router rather than sitting beside it, so plan the swap. You also need a business data SIM on whichever network has the best signal where the router will live. Then test it the way the plan says: unplug the fibre on a quiet afternoon and time how long the office is offline.

View on Amazon

Disclosure: as an Amazon Associate, IT Management 101 earns from qualifying purchases. If you buy through this link we may receive a small commission, at no extra cost to you. Availability and links were checked on 15 November 2026 and can change. DrayTek is not connected with this page.

Paper, spreadsheet or software?

Start with the workbook and a printed card; most businesses under about 50 people never need more. The thinking is the same at every size, and a plan that lives in a spreadsheet you already know is more likely to be kept up to date than one locked in a tool nobody opens. Business continuity software starts to pay its way when you have several sites, a plan per department, or clients and auditors asking for evidence of a managed programme, at which point the standard below becomes relevant. For a cost-conscious start, everything on this page is free: the template, the NCSC’s backup guidance and Exercise in a Box.

Books worth reading on business continuity

The template gets a small business to a working plan in an afternoon. These two books go further: one on the whole discipline, written for smaller organisations, and one on testing, which is where a plan is proved or found wanting. Every link goes to Amazon UK and is an affiliate link: as an Amazon Associate, IT Management 101 earns from qualifying purchases, at no extra cost to you.

Business Continuity For Dummies by The Cabinet Office, Stuart Sterling, Anna Payne and others, book cover

Business Continuity For Dummies

The Cabinet Office, Stuart Sterling, Anna Payne and others

Written with the Cabinet Office for smaller organisations, it covers the same ground as this page at a gentler pace: impact analysis, the plan itself, and getting staff to take it seriously. It was published in 2012, so check its references to standards against the dated box on this page.

View on Amazon

Practical Business Continuity Exercises: How to Test Your Organization’s Resilience by Charlie Maclean-Bristol, book cover

Practical Business Continuity Exercises: How to Test Your Organization’s Resilience

Charlie Maclean-Bristol

A 2026 book given over to the step most plans skip. Read it before your first tabletop exercise: a test is only worth running if it is designed to find the gaps.

View on Amazon

Disclosure: as an Amazon Associate, IT Management 101 earns from qualifying purchases. If you buy through these links we may receive a small commission, at no extra cost to you. Availability and links were checked on 15 November 2026 and can change. For Dummies is a registered trademark of John Wiley & Sons, Inc. Neither the publishers nor the Cabinet Office are connected with this page.

Standards and official guidance: as at 15 November 2026

  • ISO 22301:2019 (Security and resilience: business continuity management systems, requirements) is the international standard for certifiable continuity management. One amendment was published in 2024, and ISO has started work on a revised edition.
  • Civil Contingencies Act 2004: responders such as councils must keep plans to continue their own functions (section 2) and councils in England, Scotland and Wales must give businesses continuity advice (section 4).
  • NCSC small organisations guide to cyber security, including backups (published April 2026), and Exercise in a Box.
  • ICO personal data breach reporting: within 72 hours of becoming aware, where reporting is required.

We will review this box by November 2027.

Download the free business continuity plan (BCP) template

Business continuity plan template: Excel, Word and PDF

Excel: a Start here tab with the five questions, the afternoon path and the impact scale; a BIA tab that finds the MTPD, suggests an RTO, checks your RTO and sets the recovery order; a Dependencies tab that flags single points of failure; a Recovery tab that checks your RPO against the backup interval and marks untested restores; workarounds, contact tree (with call counts and rounds), testing schedule with due dates, and a first-hour card. Every tab has a matching Harbour Lane example with the same live formulas. Word and PDF: the plan as a printable document, the first-hour card on one page, and the worked example.

Licensed under Creative Commons Attribution-NonCommercial 4.0 (CC BY-NC 4.0): use and adapt it freely in your own business, teaching or training. If you share it, please link to this page.

Frequently asked questions

What should a business continuity plan include?

For a small business: a list of the activities that matter most with how long each can stop (the business impact analysis), what each depends on, a workaround for each, the recovery targets for your IT and data, who can invoke the plan and when, a contact tree and emergency numbers, a first-hour card, and a testing schedule. Our free Excel and Word template has a section for each.

What is the difference between RTO and RPO?

The recovery time objective (RTO) looks forward from the incident: how soon you aim to have an activity running again. The recovery point objective (RPO) looks backwards: how much recent work you could lose and redo, which is set by how often your data is copied. A nightly backup means an RPO of up to 24 hours, however quickly you restore it.

What is a business impact analysis?

A business impact analysis (BIA) works out how much damage the loss of each activity would do over time, so you know which to recover first and how quickly. Our version scores the worst consequence at 4 hours, 1 day, 3 days, 1 week and 2 weeks, finds the point the damage becomes unacceptable, and sets the recovery target inside it.

Is a business continuity plan a legal requirement in the UK?

The Civil Contingencies Act 2004 requires emergency responders such as councils to keep continuity plans, and requires councils in England, Scotland and Wales to give businesses advice on continuity. It does not require an ordinary private business to have one. Regulated firms may have their own rules from their regulator, and clients, insurers and public-sector buyers often ask to see a plan.

How long should a small business continuity plan be?

As short as it can be while still telling people what to do. For a business of up to about 50 people, a few pages of tables plus a one-page first-hour card is usually enough. Length is not the test; whether someone who has never read it can follow it in a crisis is.

How often should we test the plan?

Check the contact tree and test one restore every three months, run a work-elsewhere drill twice a year, and hold a tabletop exercise and a full review once a year, plus after any big change: moving office, adding a system the business relies on, or switching a key supplier. Each takes between 15 minutes and a morning.

What is the difference between a business continuity plan and a disaster recovery plan?

A business continuity plan keeps the business running: people, premises, suppliers, clients and IT. An IT disaster recovery plan is the technical part that restores systems and data, with step-by-step instructions for each system. The first sets the deadlines; the second is the method for meeting the IT ones.

Does ISO 22301 apply to small businesses?

ISO 22301 is the international standard for business continuity management systems, and ISO describes it as suitable for organisations of all sizes. Certification is voluntary. Most small businesses do not need it unless a client asks for it, but the plan in our template follows the same basic logic: understand the impact, plan the response, test it and keep it current.

Who should own the business continuity plan?

One named person with the authority to make decisions in a crisis, usually the managing director or owner, plus a named deputy who can act if the owner cannot be reached. Each critical activity also needs a named person who starts its workaround.

Is the template free to use?

Yes. The Excel workbook, Word plan and PDF are free with no sign-up, licensed under Creative Commons BY-NC 4.0: use and adapt them in your own business or teaching, and link to this page if you share them.

Sources and further reading

Our five questions, impact scale, afternoon path and worked example are our own, worked out from UK official guidance, the continuity standards and the experience of practitioners, rather than taken from any one template. Links open in a new tab.

Harbour Lane IT Ltd, its plan and its figures are fictional. Updated 21 November 2026.

Leave a Comment