RFP Template (UK): Free Word RFP + Supplier Scoring Sheet

An RFP (request for proposal) template is a ready-made document you send to suppliers asking how they would meet a need and what it would cost, so you can compare their answers on equal terms. Ours is a Word RFP with requirements tagged Must, Should, Could or Won’t, plus an Excel sheet that scores the replies: pass/fail gates, a weighted quality score and a price score that one cheap bid cannot distort.

Free, UK English, no sign-up. Blank template and scoring sheet, plus a worked example: a 38-person firm of surveyors choosing a managed IT support provider.

Key takeaways

  • Use an RFP when suppliers could meet your need in different ways and you have to judge how well. If any compliant offer will do, send a request for quotation instead.
  • Write every requirement as a numbered, testable line. A Must is a pass/fail gate, never a score: if you would accept a supplier that failed it, it is a Should.
  • Fix the criteria, weights, 0 to 5 scale and price method before the RFP goes out, and print them in it.
  • Score quality before you see any price. Each evaluator scores alone; then agree one score and write down why.
  • Score price on the total cost over the contract, against a ceiling and a target you set in advance, not against the lowest bid.
  • Before deciding, check how far the price weight would have to move to change the winner. In our example it would have to fall from 30% to 11%.

What is a request for proposal (RFP)?

A request for proposal is a competition with the rules written down in advance: you describe the outcome you need, suppliers say how they would deliver it and at what price, and you choose by criteria they have already seen. For a small business it does three jobs at once. It makes you decide what you need before a salesperson decides it for you. It gives every supplier the same information, so their prices are comparable. And it leaves a record of why you chose, which matters when the contract goes wrong in year two or a director asks why the cheapest bid lost.

The mechanism behind a good RFP is simple once you see it: every line you write is a line you will later score. Background explains context but earns no marks. Requirements become gates and scores. The evaluation section becomes the scoring sheet. If a question in your RFP does not feed a gate, a score or the contract, it is costing suppliers time and telling you nothing, so cut it.

How the RFP pack scores a bidFour bids pass through pass/fail gates, a quality score with a floor, a price score against a ceiling and target, and a final check. Bidder D is ruled out at the gates and Bidder A at the quality floor; Bidder C is preferred.Proposals4 bids in1 GatesEvery Must, pass/fail2 Quality0-5 x weights, floor3 Pricevs ceiling and target4 Checkweights, referencesPreferredBidder CBidder D out:fails gate M1Bidder A out:below the floorWrite it so you can score it: every RFP section feeds one layerPrice is opened only after quality is agreed. Kestrel Row example; fictional.
The pack in one picture: the RFP sets the rules; the scoring sheet applies them in four layers.

RFI vs RFQ vs RFP: which one do you need?

The deciding question is what you already know. If you cannot yet write the requirements, you need information, not proposals. If you can write a full specification and any supplier that meets it is as good as another, you need quotations. If suppliers could meet the same need in different ways, you need proposals, because you will have to judge quality as well as price.

DocumentUse it whenYou ask forHow you decideExample
RFI
Request for information
You know the problem but not the market: what exists, what it costs, who does it.Short questions about capability, approach and rough price.Nothing is bought. You use the answers to write requirements and a shortlist.Finding out which warehouse systems work with your courier and your accounts package.
RFQ
Request for quotation
You know exactly what you want, and any supplier that meets the specification will do.A price (and delivery terms) for a fully specified item or service.Lowest compliant price, once the specification is met.Twenty identical laptops of a named model, set up and delivered by a date.
RFP
Request for proposal
You know the outcome you need, but suppliers could meet it in different ways and you have to judge how well.A proposal: how they would do it, evidence, risks, people and a price.Weighted quality score plus price, after pass/fail gates.Choosing a managed service provider (MSP) to run IT support for three years.

The three are often used in sequence. A business replacing its warehouse system might send a short RFI to eight suppliers, use the answers to write requirements and a shortlist of four, and send those four an RFP; our warehouse management system buyer’s guide covers what to ask for in that case. Public bodies in the UK usually call the RFP stage a tender or invitation to tender (ITT). The idea is the same.

What to include in an RFP

Ten sections, in the order a supplier needs them: who you are, what you want to achieve, the requirements, what is out of scope, how you will evaluate, the commercial terms, the timetable, how to respond, the price schedule and a declaration. The template has all ten with guidance notes. Three of them do most of the work.

Requirements: numbered, testable and tagged

Write one requirement per row with an ID (M1, S1, C1 and so on) and ask suppliers to answer in the same order with the same IDs: comply, partly comply or not comply, and where the evidence is. That one discipline turns a stack of glossy proposals into something you can score line by line. Describe outcomes rather than solutions (“urgent faults answered within 1 hour”, not “a 24-hour help desk”) and leave suppliers room to propose how.

Tag every line with its MoSCoW priority, and give each tag a fixed job in the evaluation:

  • Must becomes a pass/fail gate. One failure rules the bid out, so keep the list short and genuine: a Must you would waive for a good enough price was never a Must.
  • Should is scored, and carries most of the quality points.
  • Could is scored lightly, usually under one small “added value” criterion, so it can separate close bids without deciding the contest.
  • Won’t is listed so that nobody prices it. It stops padded bids and the later argument over what was included.

How you will evaluate

Print the criteria, their weights, the 0 to 5 scale, the quality floor and the price method in the RFP itself. Suppliers write better proposals when they know what matters, and you cannot quietly move the goalposts after reading a bid you like. Public bodies are required to publish their award criteria and assessment method in advance; a private business is not, but the reasons apply just as well.

The price schedule

Ask for prices in your format, not theirs: a one-off fee, the recurring charge per user or per device, a day rate for work outside the scope, and the price of exit help. Then state the assumptions you will use to turn them into a single figure (number of users, months, expected extra days). Without that, one supplier quotes per device, another per user and a third bundles exit costs into year one, and the comparison collapses.

The RFP is not the contract. Once you have chosen, the requirements table carries into a statement of work, and if the scope itself is still fuzzy, settle it first with a scope statement or a one-page project brief.

How to score supplier proposals

Score in layers, in a fixed order: gates, then quality, then price, then a check of the result. The order matters because each layer protects the next. Gates stop a non-compliant bid from winning on price; scoring quality before opening prices stops a low price from colouring judgement; the final check stops a narrow win from being mistaken for a clear one.

Layer 1: the gates

Check every Must for every bid, Y or N, before anyone scores anything. Verify what can be verified: certificates have public registers, insurance has certificates, and a company’s accounts, officers and filing history are free to see on the Companies House register. A bid that fails a gate is not scored at all.

Layer 2: quality, 0 to 5

Group the Should and Could requirements into a handful of criteria and give each a share of the quality points. Then score each criterion on a scale with written anchors, so that a 3 means the same thing to everyone on the panel:

ScoreMeaningWhat it looks like in a proposal
0No answerNo response, or the response does not address the requirement.
1Major gapsAddresses part of it, with major gaps or no evidence. Not acceptable as it stands.
2Partly meetsMeets most of it, with gaps or thin evidence. Acceptable only with changes.
3MeetsMeets the requirement in full, with credible evidence.
4Meets, adds valueMeets it in full and adds something we value, with evidence from comparable clients.
5ExceedsGoes beyond it with strong evidence and low risk to us. No reservations.

Each evaluator scores alone, without seeing anyone else’s marks. Then the panel meets, discusses every criterion where the scores differ by 2 or more, and agrees a single score with a written reason that cites the proposal. Agreeing is better than averaging: an average hides the fact that one evaluator spotted something the others missed, and the written reason is what you will give an unsuccessful bidder who asks why. Add a quality floor as well: in our template, a bid that scores below 2 on any criterion, or below half the quality points overall, goes no further, however cheap it is.

Layer 3: price, against a ceiling and a target

Turn every price schedule into the total cost over the contract, then score it against two figures you fix before opening any bid: a ceiling, the most you would pay, which scores zero, and a target, a price you would be pleased with, which scores full marks. Prices in between score in proportion. This is the part most templates get wrong, and the next section shows why it matters.

Layer 4: check the result

Before you decide, ask how fragile the win is. The scoring sheet re-weights the same scores with price at every weight from 0% to 60% and shows the winner at each. If the winner changes at a weight you could easily have chosen, say so in the decision and lean harder on references and presentations. Then take up the references, hear presentations from the top two if it is close, and record the decision in a decision log.

Why the price formula can pick the winner

The weight on price means nothing until you say which prices earn the full marks and which earn none. “30% price” in an RFP sounds precise, but the points only exist once you set the range they are spread across. Spread 30 points across the gap between a £72,000 ceiling and a £48,000 target and each point is worth £800 of contract value. Spread them across a narrower range and each point is worth less, so price effectively carries more weight. This is the same discipline the government’s multi-criteria analysis manual applies to any weighted decision: a weight values a move from the bottom of a scale to the top, so the scale has to be fixed first.

The most common formula, the lowest bid gets full marks and every other bid gets (lowest ÷ its price) of them, avoids that decision by letting the cheapest bid set the scale. The cost is that every bidder’s price score now depends on everyone else’s price. Add or remove one bid and the gap between two others changes, which can reverse their order. Government guidance on assessing competitive tenders tells public buyers to be wary of relative scoring against the lowest-priced tender, citing its potential effect on value for money, and to compare whole-life cost rather than the purchase price.

Same scores, four price methodsBidder C wins under the ceiling-and-target method and under the lowest-bid formula with only eligible bids, but Bidder B wins when a ruled-out bid is left in the price pool.Total scores for Bidders B and C under four ways of scoring priceCeiling and target (our method)B59.1C66.8 winnerLowest-bid formula: eligible bids onlyB81.0C81.4 winnerLowest-bid formula: before the quality floorB80.0C80.2 winnerLowest-bid formula: before the gatesB73.7 winnerC73.0Quality scores never change. Only the price method, and which bids sit in the price pool, do.
Same quality scores, same prices. Only the price method changes, and so does the winner.

In the worked example below, Bidder C beats Bidder B under our method by 7.7 points, and also wins narrowly under the lowest-bid formula if only eligible bids are priced (81.4 to 81.0). But if the prices are scored before the gates are applied, Bidder D’s low price, from a bid that was always going to be ruled out, sets the scale, squeezes the price gap between B and C, and hands the win to B (73.7 to 73.0). Nothing about B or C changed. Scoring against a ceiling and target fixed in advance removes the problem, and it gives you a figure you can reason with: in this example B’s extra quality is worth 3.6 points and its extra cost of £9,072 loses 11.3.

If one bidder’s price can change another bidder’s score, the formula is choosing for you.

Worked example: choosing a managed IT support provider

Kestrel Row Surveyors Ltd, a firm of chartered surveyors with 38 staff in two offices, is re-tendering its IT support because its current contract ends in six months. It wants one managed service provider (MSP), meaning an outside firm that runs its IT for a monthly fee, to handle the service desk, security updates and backups for its Microsoft 365 setup and its practice-management software. The firm and its bidders are fictional; the method and the arithmetic are exactly what the template does.

Several requirements come straight from the National Cyber Security Centre’s guidance on choosing a managed service provider, written for small and medium-sized organisations: certification such as Cyber Essentials Plus, two-step verification on the provider’s own access, critical updates applied within 14 days, tested backups, response targets in the contract, and exit terms. The data processing gate reflects the terms the ICO says a controller-processor contract must contain, including deleting or returning your data when the contract ends.

IDPriorityRequirementHow it is assessed
M1MustHold a current Cyber Essentials Plus certificate in the supplier's own name.Gate: we check the certificate on the official search before scoring.
M2MustAccept our data processing terms (UK GDPR Article 28) for the personal data of our staff and clients.Gate: signed acceptance with the bid.
M3MustUse two-step verification on every account that reaches our systems, with no remote desktop open to the internet.Gate: written confirmation; checked again at onboarding.
M4MustRun a UK-based service desk, 08:00 to 18:00 Monday to Friday, by phone, email and portal.Gate: confirmed in the bid.
M5MustHold professional indemnity insurance of at least £2 million and cyber insurance.Gate: copies of current certificates.
M6MustCurrently support at least two clients on our practice-management software and on Microsoft 365.Gate: client names (checked at reference stage).
S1ShouldRespond to urgent faults within 1 hour and resolve routine requests within 2 working days, reporting monthly against both.Scored under service desk (Q1).
S2ShouldApply critical and high-risk security updates within 14 days of release and report monthly on anything outstanding.Scored under security (Q2).
S3ShouldBack up Microsoft 365 and file data off site every day, test a restore every month and show us the result.Scored under security (Q2).
S4ShouldComplete onboarding within 30 days of the start date, including a written audit of our systems.Scored under onboarding (Q3).
S5ShouldGive us a named account manager and a quarterly service review with a written report.Scored under service desk (Q1).
S6ShouldProvide an exit plan: return of our data and admin credentials, deletion of copies with written confirmation, and up to 5 days of handover help, priced in the bid.Scored under exit (Q4).
S7ShouldGive three references from clients with 20 to 100 staff, at least one of whom we may call.Scored under evidence (Q5).
C1CouldOut-of-hours cover for critical faults.Scored under added value (Q6).
C2CouldOne on-site day a month, split across both offices.Scored under added value (Q6).
C3CouldPhishing awareness training for staff.Scored under added value (Q6).
W1Won’tOur telephone system: it stays with its current provider.Not priced, not scored.
W2Won’tPrinters and copiers: they are covered by the lease.Not priced, not scored.
W3Won’tBuying laptops: we buy direct; the supplier sets them up under its normal service.Not priced, not scored.

Two things are worth noticing. The Musts are all things Kestrel Row would genuinely refuse to do without, and each can be checked: the Cyber Essentials Plus certificate, for instance, adds hands-on independent technical testing of the controls to the checked self-assessment behind the basic level, and current certificates can be looked up. And the Won’t list removes three things suppliers would otherwise price in different ways.

The rules, fixed before issue

Quality carries 70 points and price 30, and the RFP says so. A bid needs at least 2 on every criterion and at least 35 quality points to go further.

IDQuality criterionPointsCovers
Q1Service desk and responsiveness20S1, S5
Q2Security and backups20S2, S3
Q3Onboarding and transition10S4
Q4Exit and data return8S6
Q5Evidence and references7S7
Q6Added value5C1, C2, C3
Quality70
Price (total over 36 months)30Ceiling £72,000, target £48,000

Four bids

Four suppliers responded. Their price schedules, turned into a total over 36 months for 38 users with six days of extra work:

BidOnboardingPer user per monthDay rateTotal, 36 months
Bidder A£1,500£38£650£57,384
Bidder B£3,000£45£700£68,760
Bidder C£0£41£600£59,688
Bidder D£0£29£550£42,972

Bidder D is the cheapest by a distance, but it holds Cyber Essentials rather than Cyber Essentials Plus, so it fails gate M1 and is not scored. The other three pass every gate. The panel of three (a partner, the office manager and the finance lead) scored them separately, then met to agree:

CriterionPointsABC
Q1 Service desk and responsiveness20344
Q2 Security and backups20144
Q3 Onboarding and transition10343
Q4 Exit and data return8243
Q5 Evidence and references7344
Q6 Added value5233
Quality points7031.455.051.4

Bidder A is the second cheapest, but its answer on security updates and backups scored 1 (no restore testing and no update reporting), so it falls below the quality floor. That leaves B and C:

BidderGatesQuality (of 70)3-year costPrice (of 30)TotalOutcome
Bidder APassed31.4£57,384——Ruled out: below the quality floor
Bidder BPassed55.0£68,7604.159.1Second
Bidder CPassed51.4£59,68815.466.8Preferred bidder
Bidder DFailed M1—£42,972——Ruled out at the gates

Bidder C is the preferred bidder by 7.7 points. Bidder B wrote the stronger proposal, but its three-year total is £9,072 higher for 3.6 more quality points, and at £800 a price point Kestrel Row would have to value each extra quality point at about £2,520 to prefer it. The sensitivity check agrees: C stays ahead unless price is weighted at 11% or less. Before signing, the firm hears a presentation from both, calls one reference each, checks C’s certificate and its accounts at Companies House, and confirms in writing who owns each task during onboarding.

The commercial terms in the RFP

Section 6 of the RFP sets out what Kestrel Row will sign, so that every bid prices the same deal:

TermKestrel Row’s position
TermThree years, with a break at 12 months on 3 months' notice.
Price formatA one-off onboarding fee; a fixed monthly charge per user; a day rate for work outside the scope. All excluding VAT.
Price changesPrices fixed for the first 12 months; any later rise capped and notified 3 months ahead.
PaymentMonthly in arrears, 30 days from invoice.
Service levelsThe S1 targets, reported monthly, with a service credit when a target is missed two months running.
Data protectionOur Article 28 processing terms (gate M2); the supplier is responsible for its own subcontractors.
ExitThe S6 exit plan, priced in the bid, with data returned in a usable format.
Staff transferBidders say whether they expect the TUPE regulations to apply and on what basis.
Bid rulesProposals valid for 90 days; bidders bear their own costs; we may decide not to award.

The staff transfer line deserves a sentence. When a service moves from one contractor to another, or from an in-house team to a contractor, the TUPE regulations can transfer the employees clearly identified as providing that service to the new provider, along with their terms. For most small IT contracts nobody transfers, but asking bidders to state their assumption avoids a surprise in the price later.

A timetable that suppliers can meet

For a service like IT support, allow about four weeks (20 working days) from issue to proposals, including a week for questions, and keep the price envelopes closed until quality is agreed. A deadline of a few days gets rushed, generic proposals.

Working dayWhat happens
Day 0Issue the RFP to three to five suppliers, with the scoring sheet's criteria, weights and price method in section 5.
Day 7Deadline for clarification questions, by email to one named contact.
Day 10Answers sent to every bidder at the same time, without saying who asked.
Day 20Deadline for proposals. Price schedules go to one person and stay sealed.
Days 21-25Check the gates, then score quality individually; meet to agree each score and record the reason.
Day 26Open the price schedules and calculate the price scores.
Days 27-30Presentations from the top two, reference calls and due diligence (Companies House, certificates, insurance).
Day 32Decision, with feedback to every bidder; give notice to the current supplier if you have not already.
Day 32 onwardsAgree the contract and statement of work; onboarding starts on the date in the contract.

Answer every clarification question to every bidder at the same time and without saying who asked; it is the simplest way to keep the competition fair. After the decision, tell each unsuccessful bidder its scores and the reasons. Public bodies now have to send every assessed bidder a summary of its scores and the reasons, and suppliers who get useful feedback bid better next time.

Common RFP mistakes

  • Specifying a solution instead of an outcome. Ask for the result and the measure, and let suppliers propose how. You may learn something.
  • Musts that are not musts. Every Must is a reason to reject a bid outright. Ten of them and you may have nobody left.
  • Deciding how to score after reading the bids. The criteria quietly bend towards the proposal you liked. Fix them, print them and keep them.
  • Scoring price against the lowest bid. One bid’s price changes the others’ scores, and a bid that is later ruled out can still pick the winner.
  • Comparing first-year prices. Onboarding fees, out-of-scope rates and exit costs move the real figure. Compare totals over the contract.
  • Double counting. Asking about security under three criteria gives it three times its weight. One requirement, one criterion.
  • Averaging the panel’s scores. It buries the evaluator who spotted the problem. Discuss, agree and record the reason.
  • Forgetting the exit. Data return, deletion, admin credentials and handover help are cheap to agree before you sign and expensive afterwards.
  • Letting the presentation overrule the scores. Use it to test claims in the written proposal, not to start the contest again.
  • Not calling the references. A reference that has been written down for you is marketing until you have spoken to it.

Do you need a full RFP?

Match the process to the commitment, not to the size of the business. For something you could cancel next month, a few phone calls and an email are plenty. For a fully specified item where any compliant supplier will do (twenty identical laptops, a set number of software licences), send a short request for quotation to three suppliers and buy the lowest compliant price. For a service you will live with for years, such as IT support, a new business system or a website build, send a short RFP to three to five suppliers using this template. Where you do not yet know enough to write requirements, start with an RFI.

The free route goes all the way. The template and the scoring sheet need nothing beyond Word or Excel (or LibreOffice, or Google Docs and Sheets), and an RFP for a small service contract need not be long: our template runs to two pages before you add your requirements. Once you have chosen, record the contract’s renewal and notice dates in a contract database so the next re-tender does not catch you out, and raise orders against it with a purchase order template. If the real question is whether to buy at all, run a cost-benefit analysis first; if you are choosing between several projects rather than several suppliers, the project prioritisation scorecard uses the same weighted-scoring idea.

Public-sector rules (checked 17 November 2026; review by 17 November 2027)

  • Procurement Act 2023: new rules for public procurement came into force on 24 February 2025 (GOV.UK). They govern how public bodies buy; a private business choosing its own suppliers is not bound by them.
  • Most advantageous tender: public contracts are awarded to the tender that meets the buyer’s requirements and scores best against published award criteria. Criteria must be clear, measurable and specific, and their relative importance stated in advance (assessing competitive tenders).
  • Feedback: every supplier whose tender is assessed must receive its score and the reasons for each award criterion before the contract award notice is published (assessment summaries).
  • Security in contracts: the NCSC’s supply chain security guidance asks buyers to build security into contracting and to set out how information is returned and deleted when a contract ends.

Download the free RFP template and scoring sheet

RFP template: Word, Excel and PDF

Word and PDF: a ten-section RFP with guidance notes (background, outcomes, a requirements table with MoSCoW tags and a response column, exclusions, evaluation rules, commercial terms, timetable, response instructions, price schedule and declaration), followed by the Kestrel Row worked example. Excel: setup (criteria, weights, ceiling, target and quality floor), gates, quality scores, price (total cost over the contract and the price score, with the lowest-bid formula alongside for comparison), results, a sensitivity tab that re-weights price from 0% to 60%, and a moderation tab for individual and agreed scores with reasons. The blank tabs and the example run on the same live formulas.

Licensed under Creative Commons Attribution-NonCommercial 4.0 (CC BY-NC 4.0): use and adapt it freely in your own business, teaching or training. If you share it, please link to this page.

Frequently asked questions

What is an RFP template?

A ready-made request for proposal: the document you send to suppliers to ask how they would meet a need and what it would cost. Ours, in Word, has ten sections: background, outcomes, requirements tagged Must, Should, Could or Won't, exclusions, how you will evaluate, commercial terms, timetable, how to respond, a price schedule and a declaration. It comes with an Excel scoring sheet that applies the evaluation rules in section 5.

What should an RFP include?

Who you are and why you are buying; the outcomes you want; numbered, testable requirements, with the Musts marked as pass/fail; what is out of scope; how you will score proposals, including the weights and the price method; the commercial terms you will contract on; the timetable; how and when to respond; and a price schedule in a set format so every bid can be compared on the same basis.

What is the difference between an RFI, an RFQ and an RFP?

It depends on what you already know. A request for information (RFI) is for when you understand the problem but not the market, and nothing is bought. A request for quotation (RFQ) is for when the specification is fixed and any supplier that meets it will do, so price decides. A request for proposal (RFP) is for when suppliers could meet your need in different ways and you have to judge how well, so quality and price are scored together.

How do you score supplier proposals?

In four layers. Check every Must requirement first and rule out any bid that fails one. Score the remaining bids for quality, 0 to 5 on each weighted criterion, with each evaluator scoring alone and the team then agreeing one score and recording why. Only then open the prices and score them by a method you published in advance. Add quality and price, and check whether a plausible change in the weights would change the winner.

How should price be scored in an RFP?

On the total cost over the contract, not the first-year price, and against a ceiling and a target you fix before any bid arrives: the ceiling scores nothing, the target or below scores full marks, and prices in between score in proportion. That way one bidder's price never changes another bidder's score. The common alternative, scoring each bid against the lowest bid received, lets a cheap bid that is later ruled out change who wins.

How many suppliers should you send an RFP to?

Three to five is usually enough for a small or medium-sized business. Fewer gives little competition; more multiplies your scoring work and every supplier's bidding cost for little extra choice. Use a short request for information or a few phone calls to build the shortlist first.

How long should suppliers get to respond to an RFP?

For a service such as IT support, we would allow three to four weeks, including a week for clarification questions. A few days produces rushed, generic proposals. Publish every answer to every bidder at the same time, so nobody gains from having asked.

What is the difference between an RFP and a statement of work?

The RFP asks suppliers how they would meet your need and is used to choose one. The statement of work comes after the choice: it is the contract document that records exactly what the chosen supplier will deliver, by when and at what price. Much of a good RFP's requirements table carries straight into it.

Does the Procurement Act 2023 apply to private businesses?

No. The Act sets the rules for how public bodies buy, and it came into force on 24 February 2025. A private business is free to run its own process its own way. It matters to you if you bid for public-sector work, and its guidance on assessing tenders is a useful model of fair practice.

Is an RFP the same as a tender?

Close enough in practice. In the UK, public bodies usually say tender or invitation to tender (ITT), and private companies more often say request for proposal. Both describe a competition in which suppliers submit proposals that are assessed against published criteria.

Sources and further reading

Our scoring layers, the ceiling-and-target price method and the Kestrel Row example are our own, worked out from UK government procurement and decision-analysis guidance, NCSC and ICO guidance, and what IT support providers and buyers say goes wrong, rather than taken from any one template. Links open in a new tab.

Kestrel Row Surveyors Ltd, its bidders and all their figures are fictional and illustrative. General information to help you run a fair supplier selection, not legal or procurement advice. Microsoft 365, Excel and Word are trademarks of Microsoft; Google Docs and Google Sheets are trademarks of Google; Cyber Essentials is a UK government scheme. Updated 21 November 2026.