What Is a RACI Matrix? A Plain-English Guide (+ Free Templates)

Last updated: 12 June 2026

In short: a RACI matrix is a simple grid that records, for every task on a project, who is Responsible (does the work), Accountable (owns it and signs it off), Consulted (gives input first) and Informed (kept in the loop). It exists to answer the two questions that derail most projects: who is actually doing this? and who signs it off? This guide explains how it works, how to decide which letter each person gets, and includes a worked example and free Word and Excel templates you can download and use straight away.

Free RACI matrix templates — no sign-up, no email. Both files contain the worked ecommerce example from this guide plus a blank version to fill in for your own project.

→ Download the free Word RACI template (.docx)
→ Download the free Excel RACI template (.xlsx)

What is a RACI matrix?

A RACI matrix — sometimes called a RACI chart or a responsibility assignment matrix — is a table that maps the tasks on a project against the people involved. Down the side you list the activities or deliverables; across the top you list the people, teams or roles. In each cell you write a single letter to show how that person is involved in that task.

The four letters are:

  • R — Responsible. The person who does the actual work. A task can have more than one Responsible person if a few people share the effort.
  • A — Accountable. The person who owns the outcome and signs it off — the one who answers for it if it goes wrong. There should be exactly one Accountable person per task.
  • C — Consulted. Someone whose opinion or expertise you need before the work is done. This is a two-way conversation, not a memo.
  • I — Informed. Someone who needs to be told once the work is done or is progressing, but who does not feed into it. This is one-way.

The point of writing it down is not bureaucracy for its own sake. It is that, on any project involving more than two or three people, assumptions about who is doing what are almost always wrong — and you only find out when something important has been left undone, or when two people have done the same thing two different ways. A RACI matrix surfaces those gaps and overlaps before they cost you time.

RACI has been a standard part of project management for decades — long enough that no single person owns it — which is exactly why it has since grown the variants we cover at the end of this guide.

Why use a RACI matrix — and when you can skip one

A good RACI matrix earns its keep in a few specific ways. It removes the daily “whose job is this?” questions that eat into a small team’s week. It makes sign-off explicit, so work does not sit waiting for a decision nobody realises they are meant to make. It stops two people quietly duplicating effort. And when you bring in a new member of staff or an outside supplier, it gives them a one-page picture of where they fit.

It is most valuable when several people or teams are involved, when responsibilities overlap, or when a project keeps stalling because no one is sure who owns a particular decision. Launching a new website, moving to a new system, or onboarding a supplier are all classic cases.

Be honest about when you do not need one, though. For a quick, two-person piece of work where everyone already knows who is doing what, drawing up a formal matrix is more effort than it saves. The tool is there to remove confusion — if there is no confusion to remove, keep it in your back pocket.

How to decide if someone is R, A, C or I (or a mix)

This is the part most guides skip, and it is where people get stuck. The quickest way to decide which letter a person gets on a given task is to ask four questions, in order:

  1. Do they do the actual hands-on work? If yes, they are Responsible (R).
  2. Will they have to answer for it if it goes wrong — and do they sign it off? If yes, they are Accountable (A).
  3. Do you need their input or expertise before the work is done? If yes, they are Consulted (C).
  4. Do they just need to know it has happened? If yes, they are Informed (I).

Two rules keep the whole thing honest. First, every task needs exactly one Accountable person. One A, never two — if two people are accountable, then in practice no one is, and the decision stalls the first time they disagree. Second, every task needs at least one Responsible person, or the work will not get done.

Can someone be more than one letter? For Accountable and Responsible, yes — and in a small business it happens constantly. The founder might write the product descriptions (Responsible) and also sign them off (Accountable). When that is the case, write A/R in the cell so it is clear they are wearing both hats. What you should avoid is making someone Consulted and Informed on the same task — pick the higher one (Consulted), because consulting someone already keeps them informed.

One last piece of restraint: resist the urge to mark everyone Consulted on everything. A long column of C’s feels collaborative but it slows every task to the speed of its longest conversation. Consult the people whose input genuinely changes the outcome; keep the rest Informed.

Who decides what goes in the RACI matrix?

In a larger organisation the project manager drafts the matrix. In a small business it is usually the owner or founder, or whoever is running the project day to day. Either way, the person accountable for the project as a whole owns the first draft.

But “owns the first draft” is the important phrase. A RACI matrix should never be handed down in isolation, because the whole value of it is shared agreement. The sensible sequence is: you sketch out a draft, then sit down with the people named on it — or send it round — and let them sanity-check their own rows. People will often tell you that you have made them Accountable for something they have no authority over, or Informed about something they actually need to be Consulted on. That conversation is the tool doing its job. You finalise the matrix only once the people on it agree with their roles.

Can a RACI matrix be changed once the project has started?

Yes — and it should be. A RACI matrix is a living document, not something you draw up once and laminate. Projects change: scope shifts, people leave, a supplier joins, a phase ends and a new one begins. A matrix that is never revisited quietly stops matching reality, and then people go back to guessing.

In practice, revisit it whenever one of these happens:

  • The scope changes — new deliverables appear, or planned ones are dropped.
  • Someone new joins the project, or someone leaves and their rows need reassigning.
  • An external supplier or agency comes on board and takes over tasks that were internal.
  • You move from one phase to the next — for example, from building a website to running it day to day.
  • Work keeps stalling on a particular task, which usually means its row is wrong.

When you do change it, treat it like any other shared document: update the rows that have moved, add a date and a version number so people know they are looking at the current one, and re-confirm the changed rows with whoever is affected. A two-line email — “heads-up, the agency now owns testing, you’re Consulted not Responsible” — is usually all it takes.

RACI matrix example: launching an ecommerce website

Here is the kind of project where a RACI matrix really proves its worth: a small business launching a new online shop. There are a lot of moving parts and a mix of people involved — marketing, sales, HR, distribution, customer services, in-house IT, and an external web design agency — and it is very easy for tasks to fall between them.

The matrix below maps the main activities against those stakeholders. Read it a row at a time. Take “Set up payment gateway & checkout”: the IT person does the technical work (R), the agency is consulted on how it fits the site (C), and the owner signs it off (A) because getting paid is too important to delegate the final yes. Or “Customer service & returns process”: customer services owns and writes it (A/R), distribution and sales are consulted because returns affect them, and everyone else is kept informed.

Activity / DeliverableOwner / MDMarketingSalesHRDistribution & FulfilmentCustomer ServicesITWeb Design Agency
Agree project scope, budget & timelineA/RCIIIICC
Choose ecommerce platform (e.g. Shopify, WooCommerce)ACIIIIRC
Website design & buildACIIIICR
Brand & visual identityARIIIIIC
Product photography & imagesIA/RCIIIIC
Write product descriptions & web copyCA/RCIIIII
Set up payment gateway & checkoutAIIIIIRC
Configure shipping & delivery optionsIIIIA/RCCC
Stock & inventory setupIICIA/RICI
GDPR, cookie policy & T&CsAIICIIRC
Launch marketing campaignCA/RCIIIII
Customer service & returns processIICICA/RII
Staff training & onboardingICIA/RICII
Domain, hosting & technical setupIIIIIIA/RC
Final testing & go-live sign-offACIIIICR
Post-launch support & monitoringIIIIICA/RC
RACI matrix for a small business launching a new ecommerce website. Download the editable Word or Excel version below.

Notice a few things about how it is filled in. Every row has exactly one Accountable person. The owner is Accountable for the big, business-critical decisions — scope, platform, payments, go-live — but steps back to Informed on the day-to-day specialist tasks. And where one person both does and owns a task, the cell reads A/R. Your own version will look different, but the shape — clear ownership, work spread sensibly, no empty rows — is what you are aiming for.

Though this example is a launch, the same grid works for any job that pulls in several people, whether or not you are starting something new: onboarding a major supplier, an office move, a stocktake or a yearly audit. List the tasks, list the people, assign the letters — the work itself can be anything.

Free RACI matrix templates — no sign-up, no email. Both files contain the worked ecommerce example from this guide plus a blank version to fill in for your own project.

→ Download the free Word RACI template (.docx)
→ Download the free Excel RACI template (.xlsx)

How to build your own RACI matrix in six steps

  1. List your activities. Write the main tasks or deliverables down the left-hand column — one per row. Aim for meaningful chunks of work, not every tiny sub-task.
  2. List your people. Put the people, teams or roles across the top. Use roles rather than just names where you can, so the matrix survives someone leaving.
  3. Assign the letters. Work across each row, using the four-question test above to give each person R, A, C, I — or A/R.
  4. Check the rules. Make sure every row has exactly one A and at least one R, and that no single person is overloaded with R’s and A’s.
  5. Review and agree. Share it with the people named and let them challenge their own rows. Adjust until everyone agrees.
  6. Keep it current. Revisit it when the project changes, and re-confirm the rows that move.

If you run projects regularly, it is worth pairing your RACI matrix with a couple of our other free tools: a project on a page template for the one-sheet overview, a project management folder structure to keep your files in order, and a meeting minutes and agenda template for the recurring catch-ups where you will actually review the matrix.

Common RACI matrix mistakes to avoid

  • More than one Accountable per task. The single most common mistake. Two A’s means shared ownership, which means no ownership. Force yourself to pick one.
  • No Accountable at all. A row with only R’s and I’s has no one signing it off. These are the tasks that drift.
  • Consulted overload. Marking everyone C on everything feels inclusive but grinds the project to a halt. Consult only where input changes the outcome.
  • Building it and then ignoring it. A matrix pinned up in week one and never looked at again is just wall decoration. Revisit it.
  • Doing it in secret. If the people on the matrix have not agreed their roles, it is your opinion of who should do what, not a shared plan.

RACI variants: RASCI, DACI, RAPID and CARS

RACI is the most widely used responsibility model, but it is not the only one. You may come across:

  • RASCI — adds an S for Support: people who actively help the Responsible person, rather than just being consulted. Useful when tasks need hands-on helpers as well as a lead. Read our full RASCI guide.
  • DACI — Driver, Approver, Contributor, Informed. Built for decisions rather than tasks, with a single Driver moving things forward and a single Approver making the call. Read our full DACI guide.
  • RAPID® — Recommend, Agree, Perform, Input, Decide. A decision-making model from the consultancy Bain & Company, aimed at clarifying who actually makes a call. RAPID® is a registered trademark of Bain & Company; see Bain’s own RAPID® reference for the authoritative explanation.
  • CARS — Communicate, Approve, Responsible, Support. A simpler, action-focused alternative some teams prefer. Read our full CARS guide.

For most small businesses, plain RACI is the right starting point — it is the most widely understood and the easiest to explain to people who have never seen one. Reach for a variant only if you find RACI genuinely does not capture how your team works — and when you do, we have a dedicated guide to RASCI, DACI and CARS.

RACI matrix FAQ

What does RACI stand for?

RACI stands for Responsible, Accountable, Consulted and Informed. It is a simple way to record, for every task on a project, who does the work (Responsible), who owns it and signs it off (Accountable), whose opinion you need first (Consulted) and who just needs to be kept in the loop (Informed).

What is the difference between Responsible and Accountable?

The Responsible person does the actual work. The Accountable person owns the outcome and signs it off — the buck stops with them. On a small task one person is often both, but on bigger tasks they are usually different people: a team member does the work while the manager or owner is accountable for it being done properly.

What is the golden rule of a RACI matrix?

Every task should have exactly one Accountable person and at least one Responsible person. One A keeps ownership clear and stops decisions stalling; if a row has two A’s, no one truly owns it, and if it has none, the task will quietly fall through the cracks.

Can one person be both Responsible and Accountable?

Yes. In a small business this is common — the owner might both write the web copy (Responsible) and sign it off (Accountable). Mark the cell A/R so it is clear they are wearing both hats, and remember the one-Accountable-per-task rule still applies.

Can a RACI matrix be changed once the project has started?

Yes — a RACI matrix is a living document, not a one-off. Revisit it whenever the scope changes, someone new joins, a supplier comes on board or a handover happens. Update the rows that have changed, note the date and version, and re-confirm them with the people affected so everyone is working from the same picture.

Who creates the RACI matrix?

Usually the person running the project — the project manager, or in a small business the owner or founder — drafts it at the start. But it should never be imposed in isolation: you build the first version, then review it with the people named so they agree their roles before the work begins.

When should you not use a RACI matrix?

For very small or very short pieces of work where everyone already knows who is doing what, a RACI matrix can be more effort than it is worth. It earns its keep when several people or teams are involved, when responsibilities overlap, or when work keeps stalling because no one is sure who owns a decision.